Ozaukee Interurban Trail

The Ozaukee - Sheboygan Interurban Trail is a roughly 40-mile (64 km) long rail trail in Ozaukee, and Sheboygan Counties, in Wisconsin. The south end of the trail is in Milwaukee County but only runs 1 mile through the county.

It uses an abandoned Milwaukee Electric Railway and Light Company interurban passenger railway line which ran from Sheboygan to Milwaukee. The southern end of the trail is at Brown Deer Road in Brown Deer, and its northern end is at DeMaster Road in the Village of Oostburg Sheboygan County. It runs through the communities of Brown Deer, Mequon, Thiensville, Cedarburg, Grafton, Port Washington, Belgium, Cedar Grove, and Oostburg.

The trail is open to non-motorized pastimes, such as bicycling, rollerblading, cross-country skiing, jogging and birdwatching.

While most of the trail is on the railway right-of-way, some sections are diverted to city streets and country roads because of safety concerns or where the railroad sections are unusable.

Oversight of the trail in Ozaukee County is by the Ozaukee Interurban Trail Advisory Council. Subcommittees include Rules and Ordinance Development, Sustainability Committee, Trailside Facilities and Trail Promotions. Oversight of the portion of the Interurban Trail in Sheboygan County is under the Sheboygan County Planning and Resources Department and the Planning, Resources, Agriculture, and Extension Committee of the Sheboygan County Board of Supervisors.

Contents

History

The Milwaukee Electric Railway ran a passenger line between Milwaukee and Sheboygan from 1905 to 1948. The company became part of Wisconsin Electric (now We Energies), and the land was retained by that company after the railway ceased operation. Some segments of the right-of-way were turned into bike paths in 1975. In 1998, the county and several of its communities received state funding to build the trail. Much of the land for the trail is leased from the power company. Because much of the trail is on old railroad beds, little work needed to be done to convert the land to a bike trail. First, crushed limestone was laid. When enough money was raised, asphalt paving was begun. Some sections needed to be newly constructed, and two bridges needed to be built. A bridge over the Milwaukee River in Grafton was completed in March 2002. The official grand opening was on September 28, 2002.

A 415-foot bridge over Interstate 43 and County Highway W in the Town of Grafton was completed in late September 2009 at a cost of $1.76 million. Twenty percent was funded by private donations, while the remaining 80% was funded by the state. [1] Though it was expected to be built in the summer of 2006, the state Department of Transportation imposed design changes that boosted the cost of the bridge by $650,000. The changes were based on the DOT's decision that the bridge needed to be handicap accessible.[2]

In Sheboygan County, the initial stretch of the Interurban Trail between the Ozaukee - Sheboygan County line to Cedar Grove was constructed in 2005. The next portion of the Trail between Cedar Grove and Oostburg was constructed in 2007. There are plans to further extend the Trail from the Village of Oostburg into the City of Sheboygan via Kohler Andrae State Park. When the Interuban Trail reaches the City of Sheboygan, it will intersect with an extensive urban bikeway network, and with the Old Plank Road Trail, which stretches west from the City of Sheboygan to the Village of Greenbush, a distance of about 17 miles. Longer term plans will extend the Interurban Trail from Sheboygan north about 65 miles to Green Bay and then to other points west and north via existing trails.

See also

References

  1. ^ Don Behm, "Span takes Ozaukee Interurban Trail over I-43." Milwaukee Journal Sentinel, October 2, 2009. http://www.jsonline.com/news/wisconsin/63352207.html
  2. ^ Benson, Dan. "Ozaukee County approves $1.76 million bid for bike bridge". Milwaukee Journal Sentinel. http://www.jsonline.com/news/ozwash/36419749.html. Retrieved 2009-04-06. 